Chapter 458
Chapter 458
Chapter 458
“The second phase of the project is currently in preparation!”
He Yalong nodded. They had no choice but to get the first phase of the project in a hurry. Because of the tight time and urgency, the plan was to build two buildings in the end, so that they can go all out to build the project and don’t leave the project behind. If it’s so big, then it can be done very quickly, and it’s true that it’s now in front of you, it’s ready for delivery, but the quantity is still less after all: “If there are no accidents, the bidding will be conducted in half a month. , The second phase of the project will be carried out quickly afterwards, because the second phase of the project planning can be relatively large, it may be completed completely, it will take at least half a year.”
Completed and partially completed!
There is an essential difference between the two, because this is the reason for the construction of the community. Each building is built separately, which will not affect the progress, but it is also necessary to see what the construction party undertaking the project plans. of.
For example, if your second phase of the project is planned to build four buildings, but they only send two engineering teams, then two buildings need to be built first, and the remaining two 700 buildings will be built after the construction is almost the same. Zhuang, so that the time is spent twice, the progress will naturally slow down.
Then the problem comes again!
If it is the second phase of the project to build four buildings, why can’t the contractor directly send four engineering teams to carry out simultaneous construction?
As long as the planning is done well, I believe that the problem is not big and will not be affected by the interconnection. In this case, the speed will be much faster, but don’t forget that there is an engineering team, if it is not necessary, those who undertake the project The construction party will not do this.
After all, there is still a cost issue. Do you really think those construction workers are so cheap? The fact that they eat and drink Lazarus alone is an astronomical figure. If four engineering teams are dispatched, their costs are not known how much they will increase.
It is in their interests to be able to complete the project with the least cost.
Undoubtedly, if you have special requirements, for example, you need the construction party to send four engineering teams at the same time, then the amount of bidding will be higher accordingly, which is inevitable.
“How many buildings are planned for the second phase of the project?” An Ran is very clear about the bends here, and there are some of his ways in his heart.
“There are six buildings in total!”
He Yalong replied truthfully, paused and then continued: “Every building can be split up and bidding six times. In this way, construction can be started at the same time. In this way, there may not be three. It can be delivered within a month, but if there is only one building as a bid, those large engineering companies may be unhappy. They don’t want to undertake large projects.”
“The first phase of the project before, we also wanted to split it into two standards, but when those large companies heard of this, they were not interested. Because the project was relatively small, we could only make one standard in the end. , They were accepted, but because of the need to catch up, the price was relatively high. After all, they were required to be stationed in two engineering teams at the same time.” He Yalong added.
“So what’s the next plan?”
An Ran nodded. He realized that he was thinking too much. He shrugged helplessly and asked, “Is it planning to split the six buildings into three standards?”
“No, split into two marks!”
He Yalong shook his head and explained: “The second phase of the project will not be too late in time. It will be split into two bids, one bid for three buildings, and they are required to be stationed in two engineering teams. Will accept it, and there is no need to pay a little more.”
“My personal opinion is that some money can be saved completely. There is no need to do that. After all, the cost of our Godson International Community is not low. Everything is going to be good. In the end, it will cost a lot of money. I am not in a hurry. It can save a lot of money.” He Yalong began to plan carefully.
The helm of a company!
I really can’t just ignore it just because the company has a lot of money on the books, and when it comes to spending money, it will be approved directly.
It is irresponsible, and it is not a good manager.
If you have some money, you still need to save some money in the province. Because it is the highest manager, he has to be responsible for the company’s shareholders. Who needs it.
It must be calculated carefully. This is what a good professional manager should do.
“Okay, two marks are two marks!”
An Ran nodded. His idea is to directly split into six bids, all of which are separate, so that no matter how many companies take the next step, they can start work at the same time. But if you do this, those takers will definitely ask for the amount. Higher, otherwise they have no profit and may lose money. If they don’t change, there will be no one to take over, or some small companies to take over. That’s not what they want: “Anyway, time is not in a hurry, just Do what you want.”
“Okay…Let’s go in and take a closer look. Speaking of which, I am also curious about how the interior is decorated.” An Ran said with a smile.
There is no way to go, stop and go, even if they get out of the elevator, but they still stop in one of the floors, but they don’t really get into the interior of the apartment.
It costs a lot. He also believes that the construction party will not let him down, and he also believes that He Yalong will not let him down. After all, he attaches great importance to this community, so correspondingly, He Yalong will definitely be very concerned, just don’t know. What it became in the end.
The acceptance has passed, and everything is okay!
But what is accepted is the quality, and the final thing depends on the decoration.
Good decoration can make people’s eyes bright without saying it, and it will be very comfortable to live in. Of course, because it is the reason of the standard, and each person’s aesthetics and appetite are different, it is impossible for everyone to be I like it very much, and there will definitely be some people who are dissatisfied with here and there.
There is no way for them, and it is impossible for them to decorate each person’s aesthetics and appetite.
In that case, it is a separate customization!
All right!
If those people have such requirements, they are obviously too much.
It is conceivable that the decoration inside is definitely the kind of luxurious decoration, no matter how high-quality real estate, and let you live for free, what else do you want, if you have more requirements, it seems a bit excessive.
…….
naruto-story